Machine Shop Home  
  Introduction  |   Shop Safety  |   Layout  |   Inspection  |   Bench  |   Cutting Fluids  |   Sawing  |  Drilling

Layout - Layout Drill & Tap Gage -Project 1
Layout Home

Part # PS1#1

Part Description: Layout Drill & Tap Gage

Quantity Req.: 1

Name _______________________ Date: _____________

PLEASE HAVE INSTRUCTOR INITIAL AND DATE  GREY BOXES (*), AFTER REQUIRED OPERATIONS
Click Here to view the Part Specification

Step# Location  Description  Initials  Date
10 Instructor Obtain the correct size stock for the drill & tap gage *  
20 Bench Using a file, deburr the stock.
30 Belt Sander Lightly belt sand one end square.
40 Work Bench File one end smooth and square, deburr. Check with a solid square. End should be Square within 1/64-inches.
50 Work Bench Stamp your last name centered on the front of the piece. Use a straight edge to align the stamps. Do not double hit the stamp.
60 Instructor Have instructor check squareness. *  
70 Work Bench Layout work according to dimensions using the squared corner as the datum corner. The circles for the holes must be laid out to assure the location of the stamping of the drill sizes.
80 Work Bench Stamp "NC", "TAP", "DRILL" and all the fraction shown below. Use a straight edge to align the stamps. Do not double hit the stamp. Use the letter "I" for the bar in the fractions.
90 Instructor Turn in part for inspection *