![]() |
Machine
Shop 2 |
|
Lathe Operations
- Project 3-1 |
|
| Part # PSN3#1
Part Description: Spindle Lock Knob Quantity Req.: 1 |
Name _________________________
Date: ________________ |
PLEASE HAVE YOUR INSTRUCTOR INITIAL AND DATE THE GREY BOXES
(*) AFTER THE REQUIRED OPERATIONS.
Click here to view the part specification.
| Step# | Location | Description | Initials | Date |
| 10 | Instructor | Obtain brass or aluminum stock. | * | |
| 20 | Lathe | Place stock in a 4 jaw chuck with about 2 inches extending out of the chuck. | ||
| 30 | Lathe | Center part to within 1/16" using concentric rings. | ||
| 40 | Lathe | Have your work checked by an instructor. | * | |
| 50 | Lathe | Center part to within 1/32" using the pencil or tool holder method. | ||
| 60 | Instructor | Have checked by an instructor. | * | |
| 70 | Lathe | Center part to within .001 TIR using a dial indicator. | ||
| 80 | Instructor | Have your work checked by an instructor. | * | |
| 90 | Lathe | Face and center drill with #3 c’drill. | ||
| 100 | Lathe | Turn .90 diameter back at least 1.5". | ||
| 110 | Lathe | Set up to knurl; use a dead center in the tailstock. Use center lube. | ||
| 120 | Instructor | Have the instructor check setup. | * | |
| 130 | Lathe | Knurl the part. | ||
| 140 | Lathe | Turn the ½ thread diameter. | ||
| 150 | Lathe | Under cut to minor thread diameter. | ||
| 160 | Lathe | Cut the two accessible chamfers. | ||
| 170 | Lathe | Cut thread using a die in the lathe. | ||
| 180 | Lathe | Drill the #11 hole. | ||
| 190 | Lathe | Part off to length (see Note 1). | ||
| 200 | Bench | Deburr. | ||
| 210 | Instructor | Have your work graded by instructor. | * |