![]() |
Machine
Shop 3 |
Milling Operations
- Project 1-2
Parallels
| Part # PSR1#2
Part Description: Parallels Quantity Req.: 2 |
Name _________________________
Date: ________________ |
PLEASE HAVE INSTRUCTOR INITIAL AND DATE GREY BOXES (*), AFTER REQUIRED
OPERATIONS
Click Here to view the Part
Specification
| Step# | Location | Description | Initials | Date |
| 10 | Instructor | Secure stock from Instructor | * | |
| 20 | Vertical Mill | Tram, square or align the head on the Vertical mill according to the information sheet or the textbook information. | ||
| 30 | Instructor | Have Instructor check the squareness of the head. Be prepared to answer questions concerning how and why you square the toolhead. | * | |
| 35 | Instructor | Have instructor write the time in the box. | Time | |
| 40 | Vertical Mill | Place stock on parallels in a vise so as to be able to rough machine Datum side AD. | ||
| 50 | Vertical Mill | Set Rpm and Feed rate. Remember, this is 1045 steel. | ||
| 60 | Vertical Mill | Position cutter for facing cut. | ||
| 70 | Vertical Mill | Lock the appropriate table locks and lock the quill. | ||
| 80 | Vertical Mill | Take a trial roughing cut on the datum face AD. Leave plenty of stock for finishing cuts. | ||
| 90 | Vertical Mill | Deburr part and set up part for next cut according to the information sheet or textbook information on procedures for squaring a part. | ||
| 100 | Vertical Mill | Take a trial roughing cut on datum surface C. Leave plenty of stock for finishing cuts. | ||
| 110 | Vertical Mill | Use a solid square to check perpendicularity. | ||
| 120 | Vertical Mill | Turn the part and take the remaining 2 sides to size. | ||
| 130 | Vertical Mill | Before doing the slot, indicate the solid jaw of the vise for squareness using the method found in your study materials. | ||
| 140 | Vertical Mill | Using the height gage and an angle plate, layout the slot on both sides of the part. | ||
| 150 | Instructor | Using a piece of paper or an edge finder have instructor show you how to find the edge of the part and the slot location. Have instructor sign off. | * | |
| 160 | Vertical Mill | Cut the 0.50 slot with a 0.375 endmill on both sides. | ||
| 170 | Vertical Mill | Lay the part down on Datum AD and cut the 0.51 X 0.11 step. Make sure you have clearance above the vise. | ||
| 180 | Vertical Mill | Side mill datum surface B to clean up. Climb or conventional direction? | ||
| 185 | Layout | Layout overall length. | ||
| 190 | Vertical Mill | Machine part to 6.00 inch overall length. | ||
| 200 | Layout | Layout the 0.50 Drilled holes. | ||
| 210 | Vertical Mill | Set up a wiggler center finder. Have instructor show you how to find the center locations of the holes with the wiggler. Have instructor sign off. | * | |
| 220 | Vertical Mill | Drill Holes. | ||
| 230 | Bench | Deburr and inspect part | ||
| 235 | Time | Write the time in the box. | Time | |
| 240 | Vertical Mill | Follow the same procedure and machine part number 2. | ||
| 245 | Time | See how much time you can save doing this one. Put your start time in the box. | Time | |
| 250 | Time | Put your Finish time in the box. | Time | |
| 260 | Instructor | Turn in both parts for grading | * | |