Machine Shop 3
Milling Operations - Project 

Back to the Projects

Milling Operations - Project 
Vice Stop Part #2
(Print this sheet)

Part # PS- 12B

Part Description: Vice Stop #2

Quantity Req.: 1

Name _________________________

Date: ________________

PLEASE HAVE INSTRUCTOR INITIAL AND DATE  GREY BOXES (*), AFTER REQUIRED OPERATIONS
Click Here to view the Part Specification 

Step# Location  Description  Initials  Date
10 Classroom Fill in the steps necessary to complete project.
20 Instructor Have instructor check process sheet. Use tool steel cut before. *  
30 Instructor Indicate Tool Steel stock type for heat treat purposes.  

Page 2 of 3

PLEASE FILL IN THIS PROCESS SHEET AND HAVE INSTRUCTOR INITIAL AND DATE BEFORE RECEIVING STOCK.

Step# Location  Description 
   
   
   
   
   
   
   
   
   
   
   

Page 3 of  3

PLEASE FILL IN THIS PROCESS SHEET AND HAVE INSTRUCTOR INITIAL AND DATE BEFORE RECEIVING STOCK.

Step# Location  Description 
     
     
     
     
     
     
     
  Student Stamp Initials on back side.
  Student Assemble with Vise Stop #1 using 1.38 long 
X 10-24 UNC Cap Screw and 1.38 long X 0.1875 Dowel Pins.
  Instructor Check with instructor for heat treating.
  Instructor Turn in for Grading *