Machine Shop 4
Project - Zero It End Piece (Return to Projects)
Name:
_________________________ Date
_________________________
![]()
Part #10B
Part Desc: Zero It-End Piece
Quantity Req.: 1
![]()
PLEASE HAVE INSTRUCTOR INITIAL AND DATE AFTER REQUIRED OPERATIONS
Instructor
Step # Location Description Initials Date
![]()
10 Student Write the steps, in order,
that it will take to complete the
Zero It end piece.
20 ![]()
Instructor Have Instructor
check
procedure.
30 Instructor Get stock from Instructor.
![]()
![]()
![]()
Step # Location Description
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Step # Location Description
40 Student Machine the part.
![]()
50 Instructor Turn in part for grading.
